¡@
	    ¡@¡@¡@¡@¡@¡@Sustaining support
	    
	    
		  
		    
		      ¡@
Low yield analysis 
		      ¡@
Trouble shooting 
		      ¡@
Test program diagnostics /optimization
		      ¡@
ATE resources optimization 
		      ¡@
ATTR (Adaptive Test Time Reduction) 
		      ¡@
Test Pre-production / Characterization 
		        
		        
		        
	          
		    
        
		  ¡@Since more and more complex functions are integrated in one IC, the
	        
	      ¡@challenge of testing became more serious. The test engineers need 
	      ¡@longer time to build up their capabilities to face this change.
	      
	      
		  ¡@However, it is difficult to plan when to use test engineers and how many
 
	      ¡@to
		    be used for IC testing. As suffering this problem in many companies, 
	      ¡@we
		    offer this sustaining engineer service to help the customer to settle
		    ¡@the IC
		    test issues in production.With our professional test engineering
		    ¡@service, the customer can solve problem timely,
		    get better time-to-mar
		    ¡@-ket and save operating cost.